We started construction on the new cabin in spring of 1989.
This is a photo journal of the construction of the "new" cabin.
1989
  | 
| Killing trees for the cabin site and driveway | 
  | 
| Driveway completed by a bulldozer | 
  | 
| Augering holes for the foundation-grade wood foundation posts | 
  | 
| Mixing concrete for the post holes | 
  | 
Foundation posts complete and capped. 
Due to wiggling, the taller foundation posts at the front (north) end 
of the cabin were subsequently replaced with creosote-treated telephone poles. | 
 
  | 
| Chicken wire under the joists to keep critters out of the insulation | 
  | 
| Staining the first floor exterior cedar decks | 
  | 
| First floor 2x6 exterior walls going up | 
  | 
| First floor 2x6 exterior walls going up | 
  | 
| First floor 2x6 exterior walls going up | 
  | 
Second floor joists and plywood flooring installed. 
There's that dog again. | 
  | 
Second floor 2x6 exterior walls going up. 
There's a happy dog! | 
  | 
Second floor 2x6 exterior walls going up. 
Are there two dogs in this picture? | 
  | 
Roof scissor trusses built at Homesteader's Lumber in Big Lake 
  | 
 
  | 
| Truss engineering document | 
  | 
| Plywood sheathing installed on the roof | 
  | 
| Felt paper installed over the plywood on the roof | 
  | 
| Metal roofing over the felt paper | 
  | 
Installing metal roofing. 
Can you find the dog in this photo? 
Where's Waldo? | 
  | 
Installing metal roofing. 
There's that dog again. | 
  | 
| Felt paper over the exterior walls for weather guard | 
  | 
Installing windows. 
There are two dogs hiding in this pic. | 
  | 
| R-19 insulation for walls and ceiling | 
  | 
Construction done for 1989. Will continue in 1990. 
There they are! The two dogs! | 
1990
  | 
Cover felt paper on the walls with select pine. 
Guess what? There's that dog again. | 
  | 
Install railing. 
There's a doggy. | 
  | 
| Completed | 
 
  | 
| The journal couldn't be complete without another doggy in the picture. | 
Oh...and the view